SAP VSAFVV_CN Version: Quantities/Dates/Values in order operation Table
Overview
VSAFVV_CN is a standard SAP S/4HANA table that stores Version: Quantities/Dates/Values in order operation data. There are total 183 fields in the VSAFVV_CN table. The following is a list of the fields that make up this table. Key fields are marked in blue.
The table VSAFVV_CN belongs to Simulation (PS-SIM) module and is located in the package R/3 Application development: Version Management (CNVS).
In addition, following links provide an overview of foreign key relationships, if any, that link VSAFVV_CN to other SAP tables and standard CDS views available based on VSAFVV_CN table in S/4HANA 2020.
Techincal Settings of VSAFVV_CN
Below are technical details of the table VSAFVV_CN
- Buffering not allowed
- No buffering
- Storage type is Column Store
List of VSAFVV_CN Fields
The following table gives you an overview of the fields available in VSAFVV_CN
| Field | Description | Data Element | Check Table | Data Type | Length |
|---|---|---|---|---|---|
| MANDT | Client | MANDT | T000 | CLNT | 3 |
| VSNMR | Number or description of a version | VSNMR | CHAR | 12 | |
| AUFPL | Routing number of operations in the order | CO_AUFPL | NUMC | 10 | |
| APLZL | General counter for order | CO_APLZL | AFVC | NUMC | 8 |
| MEINH | Unit of measure for activity | VORME | T006 | UNIT | 3 |
| UMREN | Denominator for Converting Routing and Operation UoM | CP_UMREN | DEC | 5 | |
| UMREZ | Numerator for Converting Routing and Operation UoM | CP_UMREZ | DEC | 5 | |
| BMSCH | Base Quantity | BMSCH | QUAN | 13 | |
| ZMERH | Break Time | DZMERH | QUAN | 9 | |
| ZEIER | Unit for a Break Time | DZEIER | T006 | UNIT | 3 |
| VGE01 | Unit of Measurement of Standard Value | VGWRTEH | T006 | UNIT | 3 |
| VGW01 | Standard Value | VGWRT | QUAN | 9 | |
| VGE02 | Unit of Measurement of Standard Value | VGWRTEH | T006 | UNIT | 3 |
| VGW02 | Standard Value | VGWRT | QUAN | 9 | |
| VGE03 | Unit of Measurement of Standard Value | VGWRTEH | T006 | UNIT | 3 |
| VGW03 | Standard Value | VGWRT | QUAN | 9 | |
| VGE04 | Unit of Measurement of Standard Value | VGWRTEH | T006 | UNIT | 3 |
| VGW04 | Standard Value | VGWRT | QUAN | 9 | |
| VGE05 | Unit of Measurement of Standard Value | VGWRTEH | T006 | UNIT | 3 |
| VGW05 | Standard Value | VGWRT | QUAN | 9 | |
| VGE06 | Unit of Measurement of Standard Value | VGWRTEH | T006 | UNIT | 3 |
| VGW06 | Standard Value | VGWRT | QUAN | 9 | |
| ZEIMU | Unit for the Minimum Overlap Time | DZEIMU | T006 | UNIT | 3 |
| ZMINU | Minimum Overlap Time | DZMINU | QUAN | 9 | |
| MINWE | Minimum Send-Ahead Quantity | MINWEI | QUAN | 13 | |
| ZEIMB | Unit for the Minimum Processing Time | DZEIMB | T006 | UNIT | 3 |
| ZMINB | Minimum Processing Time | DZMINB | QUAN | 9 | |
| ZEILM | Unit for the Maximum Wait Time | DZEILM | T006 | UNIT | 3 |
| ZLMAX | Maximum Wait Time | DZLMAX | QUAN | 9 | |
| ZEILP | Unit for the Required Wait Time | DZEILP | T006 | UNIT | 3 |
| ZLPRO | Minimum Wait Time | DZLPRO | QUAN | 9 | |
| ZEIWN | Unit for the Standard Queue Time | DZEIWN | T006 | UNIT | 3 |
| ZWNOR | Standard Queue Time | DZWNOR | QUAN | 9 | |
| ZEIWM | Unit for the Minimum Queue Time | DZEIWM | T006 | UNIT | 3 |
| ZWMIN | Minimum Queue Time | DZWMIN | QUAN | 9 | |
| ZEITN | Unit for the standard move time | DZEITN | T006 | UNIT | 3 |
| ZTNOR | Standard Move Time | DZTNOR | QUAN | 9 | |
| ZEITM | Unit for the minimum move time | DZEITM | T006 | UNIT | 3 |
| ZTMIN | Minimum Move Time | DZTMIN | QUAN | 9 | |
| PLIFZ | Planned Delivery Time in Days | PLIFZ | DEC | 3 | |
| DAUNO | Normal duration of the activity | DAUNOR | QUAN | 5 | |
| DAUNE | Normal duration/unit | DAUNORE | T006 | UNIT | 3 |
| DAUMI | Minimum activity duration | DAUMIN | QUAN | 5 | |
| DAUME | Unit for the minimum duration | DAUMINE | T006 | UNIT | 3 |
| EINSA | Constraint on the basic start date for the activity | EINSCHRA | CHAR | 1 | |
| EINSE | Constraint on the finish date of the activity | EINSCHRE | CHAR | 1 | |
| ARBEI | Work involved in the activity | ARBEIT | QUAN | 7 | |
| ARBEH | Unit for work | ARBEITE | T006 | UNIT | 3 |
| MGVRG | Operation Total Quantity | MGVRG | QUAN | 13 | |
| ASVRG | Operation Planned Scrap Quantity | ASVRG | QUAN | 13 | |
| LMNGA | Total Confirmed Yield | LMNGA | QUAN | 13 | |
| XMNGA | Total Scrap Quantity Confirmed | XMNGA | QUAN | 13 | |
| GMNGA | Confirmed yield in order unit of measure | GMNGA | QUAN | 13 | |
| ISM01 | Already Confirmed Activity | CO_RUMNG | QUAN | 13 | |
| ISM02 | Already Confirmed Activity | CO_RUMNG | QUAN | 13 | |
| ISM03 | Already Confirmed Activity | CO_RUMNG | QUAN | 13 | |
| ISM04 | Already Confirmed Activity | CO_RUMNG | QUAN | 13 | |
| ISM05 | Already Confirmed Activity | CO_RUMNG | QUAN | 13 | |
| ISM06 | Already Confirmed Activity | CO_RUMNG | QUAN | 13 | |
| ISMNW | Actual work | CO_ISMNW | QUAN | 13 | |
| FSAVD | Earliest scheduled start: Execution (date) | FSAVD | DATS | 8 | |
| FSAVZ | Earliest scheduled start: Execution (time) | FSAVZ | TIMS | 6 | |
| FSSBD | Earliest scheduled start: Processing (date) | FSSBD | DATS | 8 | |
| FSSBZ | Earliest Scheduled Start: Processing (Time) | FSSBZ | TIMS | 6 | |
| FSSAD | Earliest scheduled start: Teardown (date) | FSSAD | DATS | 8 | |
| FSSAZ | Earliest Scheduled Start: Teardown (Time) | FSSAZ | TIMS | 6 | |
| FSEDD | Earliest scheduled finish: Execution (date) | FSEDD | DATS | 8 | |
| FSEDZ | Earliest scheduled finish: Execution (time) | FSEDZ | TIMS | 6 | |
| FSSLD | Earliest Scheduled Wait Start Date | FSSLD | DATS | 8 | |
| FSSLZ | Earliest Scheduled Wait Start Time | FSSLZ | TIMS | 6 | |
| FSELD | Earliest Scheduled Wait End Date | FSELD | DATS | 8 | |
| FSELZ | Earliest Scheduled Wait End Time | FSELZ | TIMS | 6 | |
| SSAVD | Latest scheduled start: Execution (date) | SSAVD | DATS | 8 | |
| SSAVZ | Latest scheduled start: Execution (time) | SSAVZ | TIMS | 6 | |
| SSSBD | Latest Scheduled Start: Processing (Date) | SSSBD | DATS | 8 | |
| SSSBZ | Latest Scheduled Start: Processing (Time) | SSSBZ | TIMS | 6 | |
| SSSAD | Latest Scheduled Start: Teardown (Date) | SSSAD | DATS | 8 | |
| SSSAZ | Latest Scheduled Start: Teardown (Time) | SSSAZ | TIMS | 6 | |
| SSEDD | Latest scheduled finish: Execution (date) | SSEDD | DATS | 8 | |
| SSEDZ | Latest scheduled finish: Execution (time) | SSEDZ | TIMS | 6 | |
| SSSLD | Latest Scheduled Wait Start Date | SSSLD | DATS | 8 | |
| SSSLZ | Latest Scheduled Wait Start Time | SSSLZ | TIMS | 6 | |
| SSELD | Latest Scheduled Wait End Date | SSELD | DATS | 8 | |
| SSELZ | Latest Scheduled Wait End Time | SSELZ | TIMS | 6 | |
| ISAVD | Actual Operation Start Date | ISAVD | DATS | 8 | |
| IEAVD | Actual Operation End Date | IEAVD | DATS | 8 | |
| ISDD | Actual Execution Start Date | ISDD | DATS | 8 | |
| ISDZ | Actual Execution Start Time | ISDZ | TIMS | 6 | |
| IERD | Actual Setup End Date | IERD | DATS | 8 | |
| IERZ | Actual Setup End Time | IERZ | TIMS | 6 | |
| ISBD | Actual Processing Start Date | ISBD | DATS | 8 | |
| ISBZ | Actual Processing Start Time | ISBZ | TIMS | 6 | |
| IEBD | Actual Processing End Date | IEBD | DATS | 8 | |
| IEBZ | Actual Processing End Time | IEBZ | TIMS | 6 | |
| ISAD | Actual Teardown Start Date | ISAD | DATS | 8 | |
| ISAZ | Actual Teardown Start Time | ISAZ | TIMS | 6 | |
| IEDD | Actual Execution End Date | IEDD | DATS | 8 | |
| IEDZ | Actual Execution End Time | IEDZ | TIMS | 6 | |
| PEDD | Forecast finish date of operation from confirmation | CO_PEDD | DATS | 8 | |
| PEDZ | Forecast End Time of Operation from Confirmation | CO_PEDZ | TIMS | 6 | |
| PUFFR | Free float | PUFFR_FREI | DEC | 3 | |
| PUFGS | Total float | PUFFR_GESM | DEC | 3 | |
| NTANF | Constraint for activity start (Basic) | VORGABESTD | DATS | 8 | |
| NTANZ | Constraint for activity start time (Basic) | VORGABESTZ | TIMS | 6 | |
| NTEND | Constraint for Finish of Activity (Basic) | VORGABEEND2 | DATS | 8 | |
| NTENZ | Basic finish time of the activity | VORGABEENZ | TIMS | 6 | |
| EWSTD | Forecasted start date for the activity | EWSTARTD | DATS | 8 | |
| EWSTZ | Forecast start time of the activity | EWSTARTZ | TIMS | 6 | |
| EWEND | Forecast finish date | EWENDED | DATS | 8 | |
| EWENZ | Forecast finish time for the activity | EWENDEZ | TIMS | 6 | |
| EWDAN | Normal duration (from forecast) of activity | EWDAN | QUAN | 5 | |
| EWDNE | Unit for forecast normal duration | EWDNE | T006 | UNIT | 3 |
| EWDAM | Minimum duration (from forecast) for activity | EWDAM | QUAN | 5 | |
| EWDME | Unit for forecast minimum duration | EWDME | T006 | UNIT | 3 |
| EWSTE | Forecast date constraint on activity finish | PS_RESTE | CHAR | 1 | |
| EWSTA | Forecast date constraint on activity start | PS_RESTA | CHAR | 1 | |
| WARTZ | Queue Time Used for Scheduling | WARTEZEIT | FLTP | 16 | |
| WRTZE | Unit of Measure for Queue Time | WTRZE | UNIT | 3 | |
| RUEST | Setup Time | RUEST | FLTP | 16 | |
| RSTZE | Unit of Measure for Setup Time | RSTZE | UNIT | 3 | |
| BEARZ | Processing Time | BEARZEIT | FLTP | 16 | |
| BEAZE | Unit of measure for processing time | BEAZE | UNIT | 3 | |
| ABRUE | Teardown | ABRUE | FLTP | 16 | |
| ARUZE | Unit of Measure for Teardown | ARUZE | UNIT | 3 | |
| LIEGZ | Wait Time Used for Scheduling | LIEGEZEIT | FLTP | 16 | |
| LIGZE | Unit of Measure for Wait Time | LIGZE | UNIT | 3 | |
| TRANZ | Move Time used for Scheduling | TRANSZEIT | FLTP | 16 | |
| TRAZE | Unit of Measure for Move Time | TRAZE | UNIT | 3 | |
| ISERH | Confirmed Break Time | ISERH | QUAN | 9 | |
| OFM01 | Forecast Value for Updating of Standard Value | CO_SCHAETZ | QUAN | 9 | |
| OFM02 | Forecast Value for Updating of Standard Value | CO_SCHAETZ | QUAN | 9 | |
| OFM03 | Forecast Value for Updating of Standard Value | CO_SCHAETZ | QUAN | 9 | |
| OFM04 | Forecast Value for Updating of Standard Value | CO_SCHAETZ | QUAN | 9 | |
| OFM05 | Forecast Value for Updating of Standard Value | CO_SCHAETZ | QUAN | 9 | |
| OFM06 | Forecast Value for Updating of Standard Value | CO_SCHAETZ | QUAN | 9 | |
| OFMNW | Forecasted work (actual + remaining) | OFMNW | QUAN | 7 | |
| BZOFFB | Reference Date for Start of Sub-Operation | CP_OBZOFFB | TCA54 | CHAR | 2 |
| EHOFFB | Unit for Offset to Start | CP_OEHOFFB | T006 | UNIT | 3 |
| OFFSTB | Offset to sub-operation start | CP_OOFFSTB | QUAN | 5 | |
| OFFSTE | Offset to sub-operation finish | CP_OOFFSTE | QUAN | 5 | |
| BZOFFE | Reference Date for Finish of Sub-Operation | CP_OBZOFFE | TCA54 | CHAR | 2 |
| EHOFFE | Unit for Offset to Finish | CP_OEHOFFE | T006 | UNIT | 3 |
| FPAVD | Earliest scheduled start date (forecast) | FPAVD | DATS | 8 | |
| FPAVZ | Earliest scheduled start time (forecast) | FPAVZ | TIMS | 6 | |
| FPEDD | Earliest scheduled finish date (forecast) | FPEDD | DATS | 8 | |
| FPEDZ | Earliest scheduled finish time (forecast) | FPEDZ | TIMS | 6 | |
| SPAVD | Latest scheduled start date (forecast) | SPAVD | DATS | 8 | |
| SPAVZ | Latest scheduled start time (forecast) | SPAVZ | TIMS | 6 | |
| SPEDD | Latest scheduled finish date (forecast) | SPEDD | DATS | 8 | |
| SPEDZ | Latest scheduled finish time (forecast) | SPEDZ | TIMS | 6 | |
| BEAZP | Unit of processing time (Forecast) | BEAZEP | UNIT | 3 | |
| PUFGP | Total float (from forecast) | PPUFF_GESM | DEC | 3 | |
| PUFFP | Free float (from forecast) | PPUFF_FREI | DEC | 3 | |
| BEARP | Processing time (forecast) | PBEARZEIT | FLTP | 16 | |
| EPANF | Dispatched start date for operation | EPANF | DATS | 8 | |
| EPANZ | Dispatched start time for operation | EPANZ | TIMS | 6 | |
| EPEND | Dispatched finish date | EPEND | DATS | 8 | |
| EPENZ | Dispatched finish time | EPENZ | TIMS | 6 | |
| PDAU | Forecasted duration of activity from confirmation | PDAU | QUAN | 5 | |
| PDAE | Unit of the forecasted duration from the confirmation | PDAE | T006 | UNIT | 3 |
| KNOTE | Transportation Connection Points | KNOTE | TVKN | CHAR | 10 |
| VSTZW | Deadline function | VSTZW | TVTZ | CHAR | 4 |
| VSTGA | Deadline deviation reason | VSTGA | TVTG | CHAR | 4 |
| QRASTZEHT | Time Unit | QRASTZEHT | * | UNIT | 3 |
| QRASTZFAK | Time Factor | QRASTZFAK | DEC | 5 | |
| QRASTMENG | Quantity Between Two Inspections | QRASTMENG | QUAN | 13 | |
| QRASTEREH | Grid Unit of Measure | QRASTEREH | * | UNIT | 3 |
| AUFKT | Execution Factor | AFAKT | DEC | 3 | |
| RMNGA | Total Confirmed Rework Quantity | RMNGA | QUAN | 13 | |
| ILE01 | Unit of measure for the activity to be confirmed | CO_ISMNGEH | * | UNIT | 3 |
| ILE02 | Unit of measure for the activity to be confirmed | CO_ISMNGEH | * | UNIT | 3 |
| ILE03 | Unit of measure for the activity to be confirmed | CO_ISMNGEH | * | UNIT | 3 |
| ILE04 | Unit of measure for the activity to be confirmed | CO_ISMNGEH | * | UNIT | 3 |
| ILE05 | Unit of measure for the activity to be confirmed | CO_ISMNGEH | * | UNIT | 3 |
| ILE06 | Unit of measure for the activity to be confirmed | CO_ISMNGEH | * | UNIT | 3 |
| RWFAK | Rework factor (is not used yet) | RWFAK | DEC | 5 | |
| IPRZ1 | Confirmed Quantity/Activity for Business Process | CO_IPRZS | QUAN | 13 | |
| IPRE1 | Unit of Measure for Business Process Quantity | RU_IPRZE | * | UNIT | 3 |
| IPRK1 | No Remaining Quantity Expected for Business Process | RU_IPRZK | CHAR | 1 | |
| TAKT | takt within a line segment | LD_TAKT | NUMC | 4 | |
| OPRZ1 | Remaining Quantity for Business Process | OPRZ1 | QUAN | 13 | |
| OPRE1 | Unit for Remaining Quantity of Business Process | OPRE1 | * | UNIT | 3 |
| PSPM_INDICATOR | Indicates PMCS date influence activity scheduling | PSPM_INDICATOR | CHAR | 1 |
Foreign Key Relationships
A foreign key field is a table field that is allocated to a check table and becomes part of the table's foreign key. The following table gives you an overview of the foreign keys for VSAFVV_CN
| Table Name | Field | Cardinality | Check Table |
|---|---|---|---|
| VSAFVV_CN | APLZL | 1: CN | AFVC |
| VSAFVV_CN | ARBEH | : | T006 |
| VSAFVV_CN | BZOFFB | : | TCA54 |
| VSAFVV_CN | BZOFFE | : | TCA54 |
| VSAFVV_CN | DAUME | : | T006 |
| VSAFVV_CN | DAUNE | : | T006 |
| VSAFVV_CN | EHOFFB | : | T006 |
| VSAFVV_CN | EHOFFE | : | T006 |
| VSAFVV_CN | EWDME | : | T006 |
| VSAFVV_CN | EWDNE | : | T006 |
| VSAFVV_CN | KNOTE | : | TVKN |
| VSAFVV_CN | MANDT | 1: CN | T000 |
| VSAFVV_CN | MEINH | : | T006 |
| VSAFVV_CN | PDAE | : | T006 |
| VSAFVV_CN | VGE01 | : | T006 |
| VSAFVV_CN | VGE02 | : | T006 |
| VSAFVV_CN | VGE03 | : | T006 |
| VSAFVV_CN | VGE04 | : | T006 |
| VSAFVV_CN | VGE05 | : | T006 |
| VSAFVV_CN | VGE06 | : | T006 |
| VSAFVV_CN | VSTGA | : | TVTG |
| VSAFVV_CN | VSTZW | : | TVTZ |
| VSAFVV_CN | ZEIER | : | T006 |
| VSAFVV_CN | ZEILM | : | T006 |
| VSAFVV_CN | ZEILP | : | T006 |
| VSAFVV_CN | ZEIMB | : | T006 |
| VSAFVV_CN | ZEIMU | : | T006 |
| VSAFVV_CN | ZEITM | : | T006 |
| VSAFVV_CN | ZEITN | : | T006 |
| VSAFVV_CN | ZEIWM | : | T006 |
| VSAFVV_CN | ZEIWN | : | T006 |